WE HELP TO REDUCE PRIMARY ENERGY CONSUMPTION
The biogas power station Čečejovce with its maximum power capacity of 999 kW has been in operation since 2012. It uses the technology of renewable electricity production as it combusts biogas produced from anaerobic fermentation.
Since 2012 we have been using the technology of renewable energy production as we combust biogas produced from anaerobic fermentation. We joined the ranks of those who help our nature by reducing primary energy consumption and promoting sustainability.
Company history
2016
BECOMING PART OF EG
BPS Čečejovce power plant becomes a member of Energy Group
2012
FOUNDATION OF THE COMPANY
Start of electricity production from renewable sources
2012
SBA
BPS becomes a member of Slovak Biogas Association (SBA).
2014
GUARANTEE OF ORIGINE
The Guarantee of Origin is obtained from the national regulation authority (ÚRSO).
BOARD OF DIRECTORS
Ing. Andrej Obrtlík
Chairman of the Board of Directors
Ing. Eva Krčová
Board Member
Ing. Štefan Vystavel
Board Member